Glass Plate Level Gauge Installation / Operation / Maintenance Guide Receipt, Transport and Storage On receipt of the equipment, the outside packing has to be checked for any damage incurred while shipment. If the packing case is damaged, the local carrier should be notified immediately regarding the liability. Remove the envelope containing the packing list....
SERVICE MAINTENANCE After the level gauge is first put into service, or after change of glasses, once the level gauge has reached its normal operating temperature and pressure, carefully compress the glass joints by following up the tightening bolts working at opposite sides alternately. THIS MUST BE REPEATED SEVERAL TIMES WITHIN THE FIRST HOURS, and...